Key takeaways
- The number and letters describe how fast the emulsion breaks: Rapid, Medium or Slow Setting.
- RS-1 is the standard tack coat grade; SS-1 is used for prime coat, fog seal, slurry seal and soil stabilisation; MS-1 is for premix and patching.
- Tack coat is where most emulsion goes: IS 8887 notes that around 60 to 65 percent of emulsion use is tack coat.
- Never let emulsion freeze, never overheat it, and never mix cationic with anionic emulsion.
What a bitumen emulsion is
Bitumen is solid at room temperature. To spray or mix it cold, it is broken into tiny droplets and suspended in water with an emulsifying agent. Once applied, the emulsion breaks: the water separates and evaporates, and the bitumen droplets join up and bond to the surface or aggregate. You can see it happen: brown emulsion turns black when it has broken.
Road emulsions in India are mostly cationic (positively charged), specified under IS 8887. Cationic emulsions bond well with most aggregates, including the siliceous stone common on Indian roads, and break reliably in humid weather.
The three grades side by side
| Grade | Setting speed | Main uses | Typical work item |
|---|---|---|---|
| RS-1 | Rapid | Tack coat between bituminous layers; surface dressing | Tack coat (MoRTH Section 503) |
| MS-1 | Medium | Premix carpet, open-graded premix, patch repair | Premix and maintenance |
| SS-1 | Slow | Prime coat on granular base, fog seal, slurry seal, soil stabilisation | Prime coat (MoRTH Section 502) |
RS-1: tack coat and surface dressing
A tack coat is a thin spray that glues a new bituminous layer to the one beneath. Without it, layers slip and the road cracks early. RS-1 breaks quickly so the paver can follow soon after spraying. It is also used for surface dressing, where chips are spread onto the sprayed emulsion. IS 8887 notes that around 60 to 65 percent of all emulsion used goes into tack coat, which makes RS-1 the grade most contractors buy most often.
SS-1: prime coat, seals and stabilisation
A prime coat is sprayed onto a granular base such as wet mix macadam before the first bituminous layer. It needs time to soak in and bind loose particles, so a slow setting emulsion is used. SS-1's slow break also makes it the right choice for fog seals, slurry seals and stabilising soil and shoulders.
MS-1: premix and patching
Medium setting emulsion stays workable long enough to coat aggregate in a mixer or by hand, which is why it is used for premix carpet, open-graded premix and pothole patching, including cold-mix maintenance work.
Getting the application right
- Follow the specification. Application rates and procedures for prime and tack coat are set out in IRC:16 and MoRTH Sections 502 and 503, and in your contract documents.
- Clean the surface first. Dust and loose material stop the emulsion bonding.
- Wait for the break. Lay the next layer once the emulsion has turned from brown to black.
- Watch the weather. Do not spray in rain, and allow for slower breaking in cool, damp conditions.
Storage and handling on site
- Do not let it freeze, and do not overheat it. Either can break the emulsion in the tank.
- Never mix cationic and anionic emulsions, or different grades, in the same tank or sprayer.
- Circulate or stir before use if it has been standing.
- Use it within the period on the certificate. We schedule production around your paving calendar so the emulsion reaches site fresh.
Ordering from Kutch Energies
We manufacture RS-1, SS-1 and MS-1 in-house at Anjar, Kutch. Send us the grade, quantity, site location and paving schedule. Many contractors also take VG-30 or VG-40 bitumen and LDO for the hot-mix plant from us on the same account.
Need a quote or a second opinion? Tell our trading desk your equipment, volume and delivery location. We reply within 24 hours.